A woman in rural India who has gained access to running water in her home. Note! Licensed for use on T-Time only.

Every drop counts

India is undertaking one of the world’s largest water infrastructure programs, rapidly expanding access to piped water while transforming the networks that supply it. This ambitious expansion, combined with a shift from metal to plastic pipes, could lead to significant growth in demand for Trelleborg’s seals.
7 min

At a glance

What is driving demand for pipe seals in India?
India's Jal Jeevan Mission has expanded rural tap water access from 17% to 82% of households since 2019, while pipe networks are shifting from metal to plastic. Plastic pipe joints require seals.

What does Trelleborg supply?
Two pipe seals for plastic pipes, both made in Bengaluru. Anger-Lock is designed for drinking water at high pressure, and Din-Lock for wastewater.

Why does seal quality matter?
An estimated 30–40% of water in India's distribution system is lost through leaks. Replacing a failed seal in buried pipes costs far more than the seal itself.

What happens next?
Jal Jeevan Mission 2.0 shifts the focus from installing taps to making sure water is reliably delivered. Trelleborg plans two more production lines in Bengaluru by the end of 2026.

How long do the seals last?
Stress relaxation tests show that they stay watertight for at least 120 years.

Few public works projects rival the scale and impact of India’s strong push to bring water to everyone. Since the Jal Jeevan Mission, a major national infrastructure and public health initiative launched by the Government of India in August 2019, the administration has increased the number of rural households with a water tap from 32 million (17 percent) to 159 million (82 percent). In cities, the Atal Mission for Rejuvenation and Urban Transformation (AMRUT), which acts as an urban counterpart to the rural Jal Jeevan Mission, has laid or replaced over 90,000 kilometers of water supply pipelines.

The World Health Organization (WHO) estimates that if all India’s rural households had taps, it would save Indian households without on-premises water a total of 55.8 million hours every day collecting water, while also reducing child mortality and deaths from diarrheal diseases.

“What the government of Indian Prime Minister Narendra Modi wanted was to provide clean drinking water to every household. So, not just to the major cities, but to rural households as well, and to provide it as a basic necessity,” says William Wong, Business Development Manager for Trelleborg’s seals and profiles in Asia.

A woman collecting water from public tap in India. Note! Licensed for use on T-Time only.
According to WHO, providing tap water to all rural households in India could save millions of hours spent collecting water every day.

A new market

Initially, most pipes laid under these ambitious schemes were metal ones which are not joined in a way that requires a pipe seal. It has only been over the past few years that the market has begun to accept plastic pipes, starting with high-density polyethylene (HDPE) and recently moving toward oriented PVC (PVC-O). Wong says this shift was initially driven by supply problems for metal pipes, after which customers understood the advantages of plastic for speed of construction and ease of installation.

Indian manufacturers have acquired manufacturing lines from Europe, and begun producing at scale, with several now installing Trelleborg pipe seals on site in their manufacturing facilities, so that pipe sections can be joined together in the field without a risk of leaks.

“It took a lot of time for the market to accept plastic pipes and now it has, we are seeing the market grow to the extent where we're putting in machines in India to manufacture pipe seals locally for the Indian market,” Wong says.

Trelleborg currently has two manufacturing lines for pipe seals at its facility in Bengaluru and is planning to install two more by the end of 2026 on the expectation of a significant growth in sales.

“As the market develops, we’ll get more competition – it comes fast and furious in India – so we will lose a certain amount of market share where the requirements aren't so high, but we remain confident in the long-term growth potential of our business,” Wong adds.

William Wong of Trelleborg
“We want to make it as simple as possible to use for the people that are actually installing the seals out in the field.”
William Wong, Business Development Manager for Trelleborg’s seals and profiles in Asia    

Fix and forget

Trelleborg currently offers two combined lip and compression seals: the Din-Lock and Anger-Lock.

Both are designed to be inserted into pipes in a production site and combine a plastic retaining element with a rubber sealing element. The first ensures that the seal remains in place when transported and stored at sites. The second ensures a watertight seal once the pipes are jointed.

Anger-Lock is designed for higher pressure applications, such as drinking water, as the design of the seal and surrounding pipe maintains sealing force as pressure rises. Din-Lock is more suited to wastewater, with an emphasis on secure retention, dirt exclusion, and resistance to oil and other corrosive liquids.

“We can fit them in our facility and not worry about them disappearing. Removing the seal physically takes a bit of effort with a screwdriver. We want to make it as simple as possible to use for the people that are actually installing it out in the field,” Wong explains.

To lock two sections of pipe together with the seals, workers apply pipe lubricant to the spigot end of one pipe and insert it into the socket end of the other, ensuring that the spigot passes the seal.

Anger-Lock seals installed in the pipe opening
Anger-Lock is designed for higher-pressure applications, such as drinking water.

120-year versus 5-year seals

Much of India’s pre-existing water infrastructure is more than a hundred years old, and if the pipes being laid today remain useful for a similar length of time, the initial price of a component will be only a minimal part of the cost.

The materials used can affect how a seal performs over its long lifetime, making its durability an important consideration for water companies and municipalities looking to minimize long-term maintenance and replacement needs.

The difference between the low-cost competition entering the market and Trelleborg’s seals lies in the superior quality of its materials: TPE-V (Vulcanized Thermoplastic Elastomers) used for the Din-Lock and the Ethylene Propylene Diene Monomer (EPDM) for the Anger-Lock.

“A lot of the products of the new up-and-coming manufacturers are a copy and paste of a copy and paste,” Wong points out. “They may look similar, but when you pick up the seal you find it's half the weight: half the weight means half the sealing performance.”

The stress relaxation tests Trelleborg has carried out on its materials show that Din-Lock and Anger-Lock can provide a watertight seal for at least 120 years once installed.

“We have test results for some of our materials showing they can maintain a seal for well over 500 years,” Wong says. “People need to understand that if a seal lasts only five years, they may need to replace the pipe—or at least its joints every six meters—and that cost is hard to imagine.”

The challenge for Trelleborg is to make sure that the hidden, long-term cost of a poor-quality seal is understood beyond the manufacturers that buy them. Wong says the company increasingly needs to engage directly with municipal water boards and other major customers, particularly around procurement decisions where the lowest upfront cost can be a major consideration.

While the officials responsible for procurement at some Indian municipal water companies already understand the risks of poor-quality seals, others, he believes, are “more focused on just getting the job done and moving along.”

The company is also working with the Bureau of Indian Standards to raise minimum requirements for sealing materials.

Anger-Lock vs. Din-Lock

Anger-Lock is designed for higher-pressure applications, such as drinking water. Its seal and surrounding pipe geometry maintain sealing force as pressure rises, allowing it to withstand pressures of up to 20–25 bar.
Din-Lock is better suited to wastewater applications, where secure seal retention, dirt exclusion, and resistance to oil and other corrosive liquids are priorities. The seal fits tightly into a DIN groove, making it difficult to dislodge and helping prevent dirt from entering the groove. The Din-Lock can maintain a watertight seal at pressures of up to 0.5 bar (0.05 MPa / approximately 7.25 psi).

It doesn’t stop at the tap

The impressive headline figures do not tell the whole story. Access to a tap is not the same thing as access to a reliable supply of water. There have been frequent reports in the Indian media of villages where water rarely, if ever, flows, or where if the water does flow it is of low quality. In some areas, increased access to water has led to rapidly falling groundwater levels, an issue compounded by more erratic and intense monsoon rains linked to climate change.

Recognizing this, the Indian government launched Jal Jeevan Mission 2.0 in 2026, an extension of the program which will see it “re-oriented” from installing pipes and taps to ensuring that they actually provide water. Trelleborg is playing a key role in this effort, supplying high-performance seals that are critical to the success of large-scale river-linking projects designed to bring water to communities across the country.

“There's a lot of effort by the government to start connecting waterways within India, so they can get the water to where they want it, and then also to start getting water back underground. There will certainly be a lot of piping involved in those projects,” Wong says. “This is all because of climate change. They realize they need to be able to move water across the country if it doesn't rain where they expect it to.”

He also expects the focus to shift towards wastewater and sanitation projects, boosting demand for Din-Lock.

Later, he expects the shift to move toward replacing and relining old pipes to reduce the “mind-blowing” share of water, which he estimates at between 30 percent and 40 percent, lost to leakage in India’s distribution system (even in Western cities, leakage is at around 20 percent).

India's water challenge is entering a critical new phase. In just seven years, 127 million households have gained access to taps: a remarkable achievement. Now, the government must ensure reliable water delivery, climate-resilient supplies, minimal distribution losses and effective wastewater collection and treatment. The foundations are in place; the next chapter is about making every drop count.

Writer: Richard Orange
Photos: Adobe Stock & Trelleborg

Close up of a handshake between construction worker and foreman sealing a deal on site. Businessman and architect shaking hands as a symbol of partnership at construction site. Agreement reached as colleagues shake hands at a building site with a worker in the background.

For more information

Seals & Profiles
Article published November 20, 2026

Share this article

Subscribe to T-Time newsletters

When submitting this form, you are aware of that we will process the personal data that you give us in order to facilitate your request. The legal basis for our processing of your personal data is that it is necessary in order to fulfill our legitimate interest to provide you with the subscription or un-subscription and/or information you have requested. For further details, please read our Privacy Notice

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.